Natanti acts to cutting, collection, grubbing and infested vegetation drain and floating solid waste or semi-submerged. The cutting system and frontal collection consists of a U-shaped cutter toolinstalled on a conveyor belt, adjustable in depth, able to charge what has been collected in the central storage container. They can be propelled with screw propellers with antialghe system or with paddle wheels.
SeaBoats are International Ship Brokers & Yacht Brokers, marketing and selling a wide range of boats and ships, recreational and commercial, new and used, to broad global audiences. Our dedicated international teams of are strategically located around the world and utilize modern communication strategies and a vast network of industry associates.
Whether buying or selling, let the SeaBoats team work for you.
Region
Europe
Vessel Location
Ex factory, Italy
Reference
1059
Usage
Commercial
Model Year
2018
Builder
Nettuno Motobarche
Length
49' 3" - 15.00m
Beam
5m
Draft
0.40m
Hull Material
Steel, stainless steel or aluminum.
Remarks
LENGTH: 6 to 9 mt. Length with 2.4 mt beam / 9 to 15 mt. Length with beam up to 5 mt.
Material: steel, stainless steel or aluminum.
Technical Description: Natanti acts to cutting, collection, grubbing and infested vegetation drain and floating solid waste or semi-submerged.
The cutting system and frontal collection consists of a U-shaped cutter toolinstalled on a conveyor belt, adjustable in depth, able to charge what has been collected in the central storage container.
A hydraulic loader mounted at the stern, enables the collection of floating solid materials (debris, vegetation clusters, tree trunks etc. ) The eventual eradication of rhizomes, l ' opening of waterways or excavation operations, and drain (on shore or on support units of trucks) of all of the collected and deposited in the container.
They can be propelled with screw propellers with antialghe system or with paddle wheels.
The draft can be as little as 0.35 - 0.40m. Considering the hull distance from the edge to the collection point reached by the arm, the pick-up can also collect material on the banks.
Require preferably the aid of n. 2 operators : one who navigates the vessel and actuates the cutting tape, the other maneuvering the crane distributing the material collected over the entire storage surface.
There are built in series, therefore it is possible to choose with the client the possible combinations of cutting, collection, storage, unloading, size, etc.